- About Us
- FAQ
- Air Quality
- Birth and Death Records
- Commercial Recycling
- Cottage Food
- E. coli
- Environmental Health
- Salmonellosis
- Nevada Clean Indoor Air Act
- Solid Waste Management Plan
- Special Events/Temporary Food
- Waste Reduction, Recycling, and Disposal
- Community And Clinical Health
- Water Projects/Engineering
- What is the submittal process for a water project?
- What is required when the design does not meet the minimum requirements for construction per NAC 445A?
- Can we meet with WCHD to discuss specific concerns or projects?
- Can WCHD accept “red line” corrections on plans?
- What are ANSI / NSF requirements?
- How are separation distances determined?
- Is there a special exception process?
- What is required when water infrastructure is completed?
- How do I find the status of a Water Project or Construction plan review?
- What is required for a Final Map signature from WCHD?
- What are the professional stamp and signature requirements for plan submittal?
- News Center
- Programs and Services
- Resources
- COVID-19 Info
- Gastrointestinal_Illness_(GI)_Guidelines-English
- Gastrointestinal_Illness_(GI)_Guidelines-English
- Gastrointestinal_Illness_(GI)_Guidelines-Spanish
- Northern Nevada Public Health
- Rash_(Hand_Foot_&_Mouth_Disease)_Guidelines
- Rash_(Hand_Foot_&_Mouth_Disease)_Guidelines_Spanish
- Respiratory_Illness_Guidelines-English
- Respiratory_Illness_Guidelines-Spanish
What is the submittal process for a water project?
- All water projects are submitted by the permitted public water system directly to the Northern Nevada Public Health (NNPH) (WCHD) for review and approval. All WCHD correspondence will be distributed through the water system. For WCHD to approve a construction permit or final map, WCHD must review and approve the associated water project, and the two designs must match.
- Water Project Application