- About Us
- FAQ
- Air Quality
- Birth and Death Records
- Commercial Recycling
- Cottage Food
- E. coli
- Environmental Health
- Salmonellosis
- Nevada Clean Indoor Air Act
- Solid Waste Management Plan
- Special Events/Temporary Food
- Waste Reduction, Recycling, and Disposal
- Community And Clinical Health
- Water Projects/Engineering
- What is the submittal process for a water project?
- What is required when the design does not meet the minimum requirements for construction per NAC 445A?
- Can we meet with WCHD to discuss specific concerns or projects?
- Can WCHD accept “red line” corrections on plans?
- What are ANSI / NSF requirements?
- How are separation distances determined?
- Is there a special exception process?
- What is required when water infrastructure is completed?
- How do I find the status of a Water Project or Construction plan review?
- What is required for a Final Map signature from WCHD?
- What are the professional stamp and signature requirements for plan submittal?
- News Center
- Programs and Services
- Resources
- COVID-19 Info
- Gastrointestinal_Illness_(GI)_Guidelines-English
- Gastrointestinal_Illness_(GI)_Guidelines-English
- Gastrointestinal_Illness_(GI)_Guidelines-Spanish
- Northern Nevada Public Health
- Rash_(Hand_Foot_&_Mouth_Disease)_Guidelines
- Rash_(Hand_Foot_&_Mouth_Disease)_Guidelines_Spanish
- Respiratory_Illness_Guidelines-English
- Respiratory_Illness_Guidelines-Spanish
Northern Nevada Public Health
Up
Water Projects/Engineering
- What is the submittal process for a water project?
- What is required when the design does not meet the minimum requirements for construction per NAC 445A?
- Can we meet with WCHD to discuss specific concerns or projects?
- Can WCHD accept “red line” corrections on plans?
- What are ANSI / NSF requirements?
- How are separation distances determined?
- Is there a special exception process?
- What is required when water infrastructure is completed?
- How do I find the status of a Water Project or Construction plan review?
- What is required for a Final Map signature from WCHD?
- What are the professional stamp and signature requirements for plan submittal?